Local News

Date: Thursday, March 3, 2011, 12:03pm CST

The Texas Department of Transportation announced the Highway 290 redesign this morning at Austin City Hall. The 2010 Mobility Bond Program project, slated to finish by 2012, is expected to cut evening and morning congestion in half.

The changes include adding dual turning lanes, altering traffic signal times and installing median U-turns. For more information on the project, click here.

The city of Austin will pitch in about $4 million for the project, while Travis County will pay about $1.5 million. TxDOT and the Central Texas Regional Mobility Authority will provide about $87,000.

Read more: TxDOT reveals $5.5M Oak Hill redesign | Austin Business Journal

Posted by Terese Peabody on March 3rd, 2011 3:29 PMPost a Comment (0)

Recent Posts:

Archive:

My Favorite Blogs:

Sites That Link to This Blog:

Terese Peabody, Stanberry & Associates 400 Highway 290 West Building B, Suite 101 Dripping Springs, TX 78620
Phone: Toll Free Phone: Cell: Fax:

Why Get An Inspection? | Contact Us | Curb Appeal List | Getting the Highest Price | Get Pre-qualified | Inspection Tips | All Listings | ARM Calc | APR Calc | 15 vs 30 Year Mtg Calc | ARM vs Fixed Rate Calc | Maximum Mortgage Calc | Rent vs Buy Calc | Mortgage Calculators | Staging Your Home | A holiday sale? | Holiday Saving | Holiday Theft | Winterize your Home | Local News

Copyright © 2012 Terese Peabody, Stanberry & Associates
Portions Copyright © 2012 a la mode, inc.
Another XSite by a la mode, inc. | Admin LoginTerms of UseSite Map
All rate, payment, and area information are estimates and approximations only.